The Lima Memorial Hospital

case study image

The Lima Memorial Hospital located in Lima, Ohio has installed Guardian Air units throughout their entire facility, which covered the ICU, operating rooms, waiting rooms, and separate wings of the hospital. This is a three-phase project: In the first phase they installed over 40 units to help combat some odor problems, help prevent the spread of viruses and bacteria, and improve the Indoor Air Quality as whole in their main facility. The second phase covers some of the doctors’ offices and private sectors of the facility. Just recently the facility manager from Lima had called to discuss future possibilities in their sister hospital third phase. He expressed how happy he and the Lima staff were at the results the Guardian Air and the PHI technology has provided them with their IAQ issues. There are over 200 units being installed in all three phases, which should be completed sometime in 2010.

MENU